Analysis of Technical Challenges in High-Voltage Testing of Power Transformers
Abstract
To further ensure the safety and reliability of power supply, it is crucial to conduct high-voltage electrical tests on power transformers. In this regard, after studying the main literature and related research materials on high-voltage electrical testing of power transformers, the author briefly discusses the test conditions required for such tests and analyzes the corresponding technical key points. ...
Preliminary Preparations
As is well known, conducting high-voltage electrical tests on power transformers involves certain risks. Therefore, staff must make adequate preliminary preparations and adopt reasonable measures to prevent accidents, so as to ensure the safety of test personnel and obtain reliable and accurate test results.
First, prepare relevant data and information. For example, staff can prepare data and literature from previous high-voltage tests, as well as materials on problems and suggestions from pre-tests.
Second, staff should conduct safety reviews of the transformer equipment's own safety conditions and technical issues in advance, so as to effectively improve the consistency between data and test fitting.
Third, prepare high-quality power supply equipment. From previous high-voltage tests, it is known that the power supply equipment used in tests is of large capacity. Therefore, staff should select appropriate power supply equipment according to test conditions, and ensure that the air switch can meet the test requirements.
Additionally, since the secondary current of large-capacity power supply equipment is relatively high, the cross-section of the low-voltage side wires should be reasonably set to prevent excessive heating of the secondary current during application.
Fourth, use a measuring instrument to check the temperature and humidity of the laboratory. If the temperature and humidity exceed the reasonable range for testing, personnel are prohibited from conducting high-voltage electrical tests.
Usually, since different equipment have different temperature requirements during testing, staff are required to read data based on the oil temperature around the windings.
Finally, analyze the nature of the high-voltage test. If the test is a withstand voltage test, staff should comprehensively analyze the capacity of the step-up transformer based on the actual capacity of the transformer equipment being measured, and control it reasonably.
It should be specifically noted that if the voltage value is too small, during the voltage application operation, due to the influence of current leakage, the voltage value will continuously decrease, thereby affecting the accuracy of the final test data.
Key Points of the Test
First, during the wiring process, staff should strictly follow the pre-established execution plan and not handle wiring according to personal preferences.
Second, in the early stage of high-voltage testing, staff should conduct detailed analysis of the wiring composed of each part, and urge the fairness and comprehensiveness of inspection work, so as to ensure the contact quality of the wiring to a certain extent.
In addition, during the high-voltage testing phase, staff should also improve the reliability of the grounding of the metal shell of the test instrument as much as possible. Then, if a voltage regulator device is needed during the high-voltage testing phase, staff should pay attention to whether it is in the "zero" state.
When using the voltage regulator, staff should rotate the handle evenly to increase the voltage slowly, while recording the operation and changes in instrument readings.
Finally, after completing the high-voltage test, staff must adjust the voltage of the voltage regulator back to the initial "zero" state and cut off the power supply.
Data Analysis
As is well known, there are many types of high-voltage electrical tests for power transformers, and different tests yield different data information. Therefore, when staff carefully analyze the test data, they must ensure the reliability and scientificity of the analysis work.
If during the high-voltage test, the transformer equipment emits a "dripping" sound, staff need to analyze the characteristics of the sound.
For example, when slowly increasing the voltage to the test standard, if a "dripping" sound occurs but the instrument indicator does not change, staff can reduce the voltage value to ensure the orderly progress of the test.
![]()